Other steel structures

For the aviation industry, MCE is designing, developing and implementing customized solutions in the field of demanding steel structures. Over the years, our Company has gained considerable experience in the production and construction of assembly lines and transport equipment.

Project data

Project: Production and installation of the assembly line
Weight: 400 tons
Customer: Airbus Operations GmbH and Premium Aerotec GmbH
Construction period: 2010
Location: Hamburg and Nordenham, Germany

With the start of the production of the A350XWB at the premises in Hamburg in 2009, the Airbus introduced a lightweight structure for the fuselage of the aircraft. The new type of production required a new assembly method, for which MCE GmbH developed a new concept. The new concept enables the fully automatic positioning of the aircraft’s components using laser trackers. MCE Nyíregyháza Kft. participated in the production and the construction of the steel structure of the assembly line.

Back