"Modern bridge construction is one of the defining parts of the future-oriented and conscious infrastructure design. The steel bridges, in addition to their functionality, provide ample opportunities for the designers and the builders to realize their ideas of sustainability, aesthetics and design. Our company is your full-scale partner in this.

Our company's activities cover the design, the manufacture and the installation of steel bridges on both the domestic and the international markets. We provide our custom services according to your needs. Whatever quality requirements we face, we will satisfy your demands for steel structure production and assembly!"

Bridge construction

The fixed bridges are arch bridges, suspension bridges or cable-stayed bridges. The fixed bridges make up the majority of the bridges that are built, whether for pedestrian, road, highway, or rail traffic, and a great example is the Berkó Bridge.

References

Moveable bridges are mainly used to cross waterways or harbour entrances to guarantee the uninterrupted ship traffic. Rethebrücke in Hamburg is a good example. The moveable bridge, which received the German Steel Construction Award, is an important infrastructural junction in the Port of Hamburg. As a member of the "ARGE Rethebrücke" consortium, MCE Nyíregyháza Kft. has participated in the production and the assembly of its steel structure.

References

In order for a bridge to meet the requirements for low-maintenance bridge construction, especially in the developing and emerging countries, MCE has developed a new system of "modular bridges" in a multi-year process. The design is based on state-of-the-art and cost-effective combined bridge construction. The modular design allows the use of the individual components as a single-span or multi-span bridge.

References
0 Years
0 Countries
0 Projects
0 (thousand tons) of Steel

Berkó bridge

Project: The project covered the production, the corrosion prevention and the pre-assembly of the steel structure.
Weight: 1,450 tons
Customer: NIF Zrt.
Construction period: 2017-2018
Location: M8 expressway in the vicinity of Vasszentmihály


The M44 expressway is an important route in the south-eastern region of the country, the Berkó bridge provides a crossing over the River Kőrös on this road section. The 1,450-ton steel structure was manufactured and pre-assembled by MCE Nyíregyháza Kft. in 2017-2018.

BAB A30 Motorway bridges in Bad Oeynhausen

Project: The project covered the partial production and assembly of the steel structure of the bridge.
Weight: 2,645 tons
Customer: Landesbetrieb Straßenbau Nordrhein-Westfalen
Construction period: 2011-2012
Location: Bad Oeynhausen, Germany

To facilitate the traffic in one of Europe's busiest regions. To overcome the shortages of the A30 motorway around Bad Oeynhausen, striking bridge structures were built at the eastern and western ends to cross the River Werre. Despite the different topographical terrains, both structures have a uniform design concept, so they fit harmoniously into the surrounding landscape.

Adomi Bridge

Project: The project covered the production and the assembly of the steel floor structure of the bridge.
Weight: 800 tons
Customer: Ghana Highway Authority
Construction period: 2012-2014
Location: Atimpoku, Ghana

The Adomi Bridge is located in the southern part of Ghana, in the town of Atimpoku, which thus connects the eastern region of Ghana with the River Volta and the region of the lake. The bridge was built between 1956 and 1957, and due to wear and tear, it has been needing renovation since the 2010s. Our parent company, MCE GmbH, won the completion of the rehabilitation of the bridge on behalf of the Ghana Highway Authority, and as a subcontractor, our Company manufactured and assembled the new components.

Rethebrücke

Project: Two-part opening road and port railway bridge; our Company manufactured and assembled the steel structure of the road bridge, including the corrosion prevention.
Weight: 1,100 tons
Length: 136 meters
Customer: Hamburg Port Authority
Construction period: 2012
Location: Hamburg, Germany

With a span of 104.20 meters, Rethebrücke is the largest opening bridge in Europe. With the construction of the bridge, the width of the shipping passage increased from 20 to 64 meters. The road and the port rail traffic are running on separate adjacent structures. Rethebrücke's innovative design won the 2020 German Bridge Construction Award.

M8 Valley Bridge in Vasszentmihály

Project: The project has covered the production, the corrosion prevention and the assembly of the steel structure.
Weight: 1,050 tons
Customer: NIF Zrt.
Construction period: 2018-2020
Location: M8 expressway in the vicinity of Vasszentmihály

An important link in the border traffic between Hungary and Austria is the M8 valley bridge near Szentgotthárd, which, as a new transit hub, enables fast and uninterrupted passenger and freight traffic between the area of Graz and Southwestern Hungary. The 1,050-ton structure was built by MCE Nyíregyháza Kft. between 2018 and 2020.